skip to main
|
skip to sidebar
F-22 Trifun
Farrier F-22 Trimaran build in Switzerland
Showing posts with label
Planking
.
Show all posts
Showing posts with label
Planking
.
Show all posts
Wednesday, July 2, 2008
Planking
I am using Airex foam (it is produced near my place). I bent the strips with the help of a heatgun and fix them with particle board screws. I will use the dremel method to make slots for the glue.
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2009
(2)
▼
November
(1)
Float inside finished
►
September
(1)
►
2008
(8)
►
December
(1)
►
October
(2)
►
September
(2)
►
July
(3)
Links
Tor's F-22
Farrier F-22
.
About Me
Trifun
Bremgarten, Aargau, Switzerland
View my complete profile
Followers